PureGreen Plumbing LLC completed a utility infrastructure project at Goethe State Forest – Tidewater Trails, supporting the expansion of RV camping facilities within the park. The project focused on extending water and sewer services to accommodate multiple RV hookups across the property. Our scope of work included the installation of over 2,000 linear feet of 1-inch water main, supplying potable water to six separate RV service locations throughout the campground. In addition, we installed approximately 200 linear feet of new 4-inch sewer main, providing a designated pump-off location for RV waste disposal. All trenching and excavation was completed using a mini excavator, allowing for efficient installation while minimizing environmental impact to the surrounding forested area. The project was completed with a focus on durability, accessibility, and long-term use in a public recreation setting.